| OE NO. | 080V96820 - 0243 | Condition | New |
| Place of Origin | China | Purpose | for replace/repair |
| Material | Standard | Type | Multi Wedge Belts |
| Size | Standard | Model Number | 080V96820 - 0243 |
| Truck Model | Sinotruk Truck | Product Name | Multi Wedge Belts |
| Part Number | 080V96820 - 0243 | Packing | Standard Package |
| Application | Sinotruk HOWO Truck Engine Parts | MOQ | 2 Pcs |
| Delivery time | 7 - 30 Days | Payment | T/T |
| Transport | Sea, land, and air |


080V96820-0243 multi-v belt is a 100% new transmission component designed for HOWO truck engines, compatible with both AC and DC systems. Available in 6PK, 8PK, 10PK, it precisely matches different engine models, ensuring stable power transmission to generators, air conditioners, and other equipment through multi-rib engagement with pulleys.
Key advantages of this new belt: 100% new materials (no aging/wear) ensure optimal elasticity; reinforced cords improve tensile strength by 40% compared to ordinary belts; precision-machined ribs (tolerance ±0.08mm) reduce noise and energy loss, with transmission efficiency ≥98%.
Easy to install—directly replace old belts without adjusting pulleys. Ideal for maintaining HOWO truck engine transmission systems.

Heavy-Duty Transportation: Ensures stable operation of generators and air conditioners in long-distance/howo trucks.
Engineering Operations: Adapts to harsh environments (dust, vibration) in construction/mining sites.


Produced under ISO/TS 16949 standard:
Raw Materials: 100% new rubber and high-strength cords, passing strict tests.
Manufacturing: Advanced vulcanization process ensures uniform rib formation.
Quality Check: 100% inspection for new products, including dimension and tensile tests.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.